Croatia prepares LNG terminal, pipeline capacity expansion
Date: March 23rd 2023
Author: Dalibor Dobrić
Category: Articles
Topic:
Natural gas
Reviews from our subscribers
Prof. Igor Papič, Ph.D., Rector of the University of Ljubljana
CHECK ALSO
-
18.08.2022 - Croatia decides to double LNG terminal capacity to 6.1 bcm
-
25.11.2022 - Austria, Bavaria and Croatia sign deal to raise energy resilience
-
25.11.2022 - Experts differ on Austria-Bavaria-Croatia joint energy plan
-
13.03.2023 - Record virtual gas trade supports Croatia exchange plan – expert
-
24.03.2023 - Croatian LNG terminal capacity sold out until 2030 – manager
-
05.04.2023 - Croatian LNG terminal capacity now booked until 2037 – operator
-
14.04.2023 - Croatia eyes EUR 3.6bn EU loans, mainly for energy projects – PM
-
17.04.2023 - LNG Croatia inks EUR 22.9m deal for new FSRU regas module